Hospital project

Clinic Moncucco Day Hospital

Description

Extension intervention for the construction of new beds for day hospital. The requests were to obtain an open plan building with wide spans (8-10 m) and reduced thickness. Requests respected by using post-tensioning systems with adherent cables and flat sheaths to limit the thickness of structural elements and the interference between cable ducts.

Construction Site Duration: 2017-2018  

Amount of works: -

Company:   Impresa Aldo Lepori 

Work direction:   Impresa Aldo Lepori 