Clinic Moncucco Block B
Extension intervention for the realization of 12 hospitalization rooms and two floors of medical studies. Particularity of the intervention the realization of foundations of floating type that crossed an existing building in order to cancel the effect of "dragging" that would have had with traditional systems of constraint and foundation.
Construction Site Duration: 2020-in corso
Amount of works: 5 000 000 CHF
Company: Impresa Aldo Lepori
Work direction: Impresa Aldo Lepori