Anchored excavation, Albonago
Excavation with consolidation of the walls using shotcrete (spritz concrete) and active (lightly preloaded) and passive nailing. Maximum height of the excavation walls 8-10 m
Construction Site Duration: 2019
Amount of works: -
Company: EVLS SA
Work Direction: EVLS SA