Post-tensioned slab, Busto Arsizio
This is the construction of mezzanine floor in existing prefabricated structure.The floor has a uniform thickness of 400 mm and an area of 3800 square meters. As supports of the floor are used the existing columns (on which are mounted brackets for the support of the floor) and new columns in place. Given the size of the structure has been divided into the floor between ashlar casting.
Construction Site Duration: 2014-2017
Amount of works: -
Company: -
Work direction: -