Opere zona industriale, Ferriere Nord Osoppo s.p.a.
This is the construction of new works (heli-rescue pad, scrap platform, ecological pad), at the Ferriere Nord plant in Osoppo (UD). The heli-rescue landing and take-off pad with a diameter of 26.20 m and thickness of 25 cm was made of reinforced concrete. The wreckage platform, with two support plinths for two light towers and a water drainage channel at its side, are made of reinforced concrete and were divided into ashlars and connected to each other by expansion joints that allow a square subdivision for each ashlar and better optimization of casting operations. The ecological apron, also rectangular in shape, is divided into two main parts, one for the placement of dumpsters and one part dedicated to the stationing of bulk material divided between them with walls made of reinforced concrete. inside the apron there is also a light tower with its foundation plinth.
Translated with www.DeepL.com/Translator (free version)
Construction Site Duration: 2014-2017
Amount of works:
Company:
Work direction: