Residential Barbengo
Residential intervention, excavation with nailed wall stabilized with spritz-beton. Mixed structure building, prefabricated wood and post-compressed concrete.
Construction Site Duration: 2014-2015
Amount of works: 2 300 000 CHF ca.
Company: Fratelli Censi SA
Moose SA